General Information

Buildings come in 6 metre wide bays.

Additional bays can be added to give the desired size.

Eaves heights up to 6 metres are possible with spans up to (editing)

Yes

Order as a frame only option.

Each building can be designed to suit its purpose.

From simple not insulated buildings, to fully insulated structures.

Just let us know what you plan to use the building for & we will make sure your kit building meets the requirements.

Buildings are fixed to the ground with anchor bolts.

Suitable concrete bases/foundations are required.

We do not provide any foundation services.

This needs completing by others prior to a buildings arrival on site.

Details on how to assemble a structure can be found further down this page.

Yes

Simply purchase additional bays to add to the existing structure.

After an order has been confirmed.

We aim to have your new kit building on site, in 2-4 weeks ( Frame Only )

3-6 weeks for a frame and cladding package.

  • Single Skin Sheet profiles.
  • Insulated Roof Panel options.
  • Snaplock Seam® & Standing Seam panels
  • Single Skin Sheet profiles.
  • Insulated Wall Panel options.
  • Snaplock Seam® & Standing Seam panels
  • Reveal Wall & Soffit Panels.
  • Metal Shingles
  • Honeycomb Panels
  • Box Gutters
  • Half Round
  • Ogee
  • Round Pipes
  • Square Pipes
  • Various Metals
  • Various Finishes

Buildings are delivered as component parts for customers or assigned workers to assemble.

Suitable space must be made available before buildings arrive on site.

Add items from the component section to your cart then go to check out to send the order enquiry.

Alternatively email mail@steelkitbuildings.co.uk or use the contact form to let us know the size required.

If roof or wall cladding products are required add any details or questions.

Tell us what the intended use will be and any other details or info you can think of that might be relevant.

In either case, as soon as possible we will contact you for more information or if enough has been provided, email a quotation to you.

Let us know if you require installation services for your kit building & we will check availability.

Z-Structure

A Z-structure is composed of Z-profiles.

 

This profile has both a narrow and a wide flange.
Perforated, in the narrow flange, is a small, identifying hole.

This hole has no relevance during the assembling.
In the normal loading case, the type of profile to choose is principally influenced by the width of the building:

 

1/ width up to 10m: Σ-profiles
2/ width 10m and more: Z-profiles of 300mm

The column profiles and the roof beams are composed of double-mounted profiles.

I column, II beam

Single-mounted profiles are used to make the roof- and wall purlin and the gables.

 

III wall purlin
IV tie rod
V roof purlin
VI diagonal brace
VII vertical gable
VIII horizontal gable

 

Construction Sequence For Z Structures

01. Feet

Fasten the feet [ 1 za ] To the foundation with anchoring bolts.

02. Columns

Assemble the columns [ I ] and install them onto the feet [ 1 ZA ]

03. Wall Purlins

Fit the wall purlins [ III ] In between the columns [ I ]

04. Beams

Assemble the beams [ II ] Attach the beams [ II ] To the columns [ I ]

05. Tie Rods

Fasten the tie rods [ IV ] to the middle beams [ II ]

06. Roof Purlins

Fit the roof purlins [ V ] In between the beams [ II ]

07. Diagonal Bracings

Attach the diagonal wind braces [ VI ] to the columns and beams

08. Vertical Gable

Attach the vertical profiles of the gable [ VII ]

09. Horizontal Gable

Attach the horizontal profiles of the gable [ VIII ]

10. Roofing & Cladding

Install a range of roof and wall panel products.

 

Σ-Structure

A Σ-structure is built with cold-rolled sections.

In the normal loading case, the type of profile to choose is principally influenced by the width of the building:

 

1/ width up to 10m: Σ-profiles
2/ width 10m and more: Z-profiles of 300mm

The column profiles and the roof beams are composed of double-mounted profiles.

I column, II beam

Single-mounted profiles are used to make the roof- and wall purlin and the gables.

 

III wall purlin
IV tie rod
V roof purlin
VI diagonal brace
VII vertical gable
VIII horizontal gable

 

Construction Sequence Σ-Structures

01. Feet

Fasten the feet [ 1 za ] To the foundation with anchoring bolts.

02. Columns

Assemble the columns [ I ] and install them onto the feet [ 1 ZA ]

03. Wall Purlins

Fit the wall purlins [ III ] In between the columns [ I ]

04. Beams

Assemble the beams [ II ] Attach the beams [ II ] To the columns [ I ]

05. Tie Rods

Fasten the tie rods [ IV ] to the middle beams [ II ]

06. Roof Purlins

Fit the roof purlins [ V ] In between the beams [ II ]

07. Diagonal Bracings

Attach the diagonal wind braces [ VI ] to the columns [ I ]

08. Vertical Gable

Attach the vertical profiles of the gable [ VII ]

09. Horizontal Gable

Attach the horizontal profiles of the gable [ VIII ]

10. Roofing & Cladding

Install a range of roof and wall panel products.

 

×
×